MegaPack · project-engineered BESS

Project-engineered battery storage from industrial sites to grid-connected plants

Precifarm designs and integrates BESS for factories, EV charging hubs, solar + storage and utility-scale plants in Kenya. Power, energy and equipment are specified per site — not sold as a catalogue SKU.

Conceptual platform. Not on sale as a catalogue product. Precifarm designs and integrates; we do not manufacture cells, PCS or containers.

Precifarm MegaPack site — storage, solar and EV charging in Kenya

Precifarm is the designer, integrator and project developer. Cells, PCS and enclosures come from qualified suppliers. We size from your load, connection point and operating hours — whether that is a facility meter or a grid interconnection.

Precifarm role

Design, integrate and develop the project

Typical range

From single-digit MWh toward GWh-class parks

Kenya context

Kenya Power, Grid Code and EPRA per project

Precifarm utility-scale storage plant with solar in Kenya
Utility-scale plants are engineered from the grid connection inward.

Applications

Battery storage for industrial sites and grid-connected plants

Industrial and commercial

Solar + storage

Shift daytime generation to evening demand

Commercial / industrial

Clip peaks and manage maximum demand

EV charging hub

Buffer charging spikes alongside grid and solar

Microgrid

Coordinate generation, storage and local loads

Grid-connected plants

Grid-scale BESS

System support where approved and contracted

Renewable park

Shift output and reduce variability at plant level

Solar + storage park

Integrate renewable output at park scale

Energy park

Multi-block plant with shared grid infrastructure

System architecture

An integrated storage stack from connection to battery blocks

Typical grid-connected layout. EMS and metering sit in the operating layer. Final equipment is specified per project.

  1. Point of connection

    Kenya Power tie-in or facility supply

  2. Protection + switchgear

    Fault isolation and coordination

  3. PCS / inverters

    Bidirectional AC conversion

  4. Battery blocks

    Modular storage — LFP where appropriate

  5. BMS

    Cell and block monitoring and limits

  6. EMS / SCADA

    Charge, discharge, dispatch and operator visibility

Plant scale

Storage capacity grows in modular blocks as the project stages

Energy Block

Project engineered

Repeatable storage and conversion block

MegaPack

~5–100 MWh

Integrated site or plant section

Energy Hub

~25–500 MWh

Multi-unit site, shared connection

Energy Park

500 MWh → GWh

Staged park infrastructure

Illustrative — final MW, MWh and duration are engineered per project.

EV charging hub

Battery storage supports the hub but does not replace grid capacity

Illustrative Precifarm EV hub with storage and DC charging

Grid

1 MW

Kenya Power study required

Solar

1 MW

Site dependent

BESS

5 MWh

Engineered per project

Chargers

1–2 MW

Vehicle mix dependent

Illustrative only. Storage can reduce instantaneous grid demand. It does not remove interconnection studies or reinforcement.

Power and energy

Power and energy are specified separately for each project

Industrial site

Power
2 MW
Energy
8 MWh
Duration
~4 h at rated power

Peak shaving at a factory or charging hub

Utility plant

Power
50 MW
Energy
200 MWh
Duration
~4 h at rated power

Grid-connected renewable or BESS park

Usable hours depend on SOC limits, efficiency, reserves, grid dispatch rules and operating strategy.

Project delivery

How we deliver a MegaPack project in Kenya

  1. 01

    Discover

    Load or export objectives, land and operating model

  2. 02

    Model

    MW, MWh, duration and economics

  3. 03

    Connect

    Kenya Power application, studies and Grid Code alignment

  4. 04

    Engineer

    Electrical, civil, protection and controls

  5. 05

    Permit

    EPRA, county and environmental where required

  6. 06

    Build

    Procure, install and integrate in agreed stages

  7. 07

    Commission

    Protection tests and witness where required

  8. 08

    Operate

    Monitor, maintain and report

Kenya regulatory context

Approvals depend on connection type, scale and how the system is used

Grid-connected BESS needs Kenya Power interconnection, applicable EPRA requirements, and county or environmental permits where they apply. Precifarm does not promise approval or grid revenue.

Kenya Power

Connection, metering, testing and Premium large requirements where they apply

Grid Code

ESS technical requirements at the point of connection

EPRA

Licensing framework where it applies to the project

Net metering

Consumer self-generation up to 1 MW — not assumed for utility-scale BESS

County / NEMA

Permits where applicable

Market / offtake

Grid services or export only where contracted

MegaPack is a project-engineered platform. Export, public EV charging and electricity supply may need licences and agreements under Kenyan law.

FAQ

Common questions about MegaPack projects

Is MegaPack a product I can buy off the shelf?

No. MegaPack is project-engineered. Power, energy and equipment are specified from your site load, connection point and operating model.

Does Precifarm manufacture the battery?

No. We design and integrate. Cells, PCS, switchgear and enclosures come from qualified suppliers.

Can storage replace a larger grid connection?

No. It can reduce instantaneous demand where that helps. Kenya Power interconnection studies still apply.

Does BESS qualify for net metering?

Not by default. Kenya's net-metering framework targets consumer self-generation up to 1 MW. Utility-scale plants follow a different regulatory path.

Can the plant export power to the grid?

Only with the right connection agreement, licensing and market structure. Export is not assumed in early-stage discussions.

Does it provide backup in a blackout?

Only if designed for it — topology, transfer gear, protection and state of charge all matter.

Share your site or connection point to start a MegaPack conversation

Tell us what you power, your MWh target, and where the system connects.