Energy supply
Grid power on an e-mobility tariff, rooftop solar and LiFePO₄ storage combine to keep energy dependable and costs predictable.
Charge Map
Precifarm is building Kenya's intercity charge map — charging infrastructure and operating software that make electric travel between Kenyan cities dependable, affordable and easy to book. Hubs provide the energy; the operating layer provides the timetable, tickets and passenger data.
Connectivity map
Interactive map with live-demo availability, partner charging sites, route overlays and directions. Tap Near me to sort by distance.
Depot & hub access
Availability is illustrative for this live demo — not real-time bay telemetry.
Hub anatomy
A hub is not a charger bolted to a car park. It is intercity infrastructure that brings together energy, passenger dwell, monitoring and payment in one dependable stop.
Grid power on an e-mobility tariff, rooftop solar and LiFePO₄ storage combine to keep energy dependable and costs predictable.
Modular CCS2 DC dispensers provide reserved charging windows for scheduled coaches and contracted fleet vehicles.
Safe circulation, shade and amenities make each stop worth the timetable — not just a quick top-up at a lone charger.
We monitor hubs around the clock, publish live status, support M-Pesa and fleet billing, and recover honestly when something fails.

Four layers, one hub
Energy supply, fast charging, passenger dwell and operations — integrated in one dependable stop.
Route rollout
Each new intercity route follows the same discipline: prove utilisation, uptime and partner economics before the next hub is financed.
Kisumu hub, en-route charging at Nakuru and Nairobi depot access
Our current route — hub uptime, partner service, passenger booking and the operating economics behind Nairobi–Kisumu.
Mtito Andei, Voi and Mombasa hubs with Nairobi depot access
The coast route — scheduled intercity service and dependable charging from Nairobi to Mombasa, added once Nairobi–Kisumu demonstrates utilisation, uptime and partner returns.
En-route charging along the eastern route, with Garissa as the terminus hub
Eastern reach to northeastern Kenya, opened only after Nairobi–Kisumu and the Mombasa route pass utilisation, partner returns and financeability gates.
Site selection
A lone charger cannot support an intercity route. Every site must satisfy all five tests before we commit capital to build.
Fleet or passenger energy must be committed before we deploy capital to a site.
Feeder studies, interconnection and tariff clarity must be resolved before irreversible spend.
The location must support safe vehicle circulation, passenger comfort and amenities worth stopping for.
We need long-term site rights, ideally at fuel retailers, yards or transport termini.
Regulatory and safety sign-off must be in place before public operation begins.
Fuel retailers, yards and termini make strong hub hosts. Share the location and we will assess it against our route demand, power and site criteria.